| No | Client | Project | City | Country | Start Date | Completion Date | Value EURO | Supervision |
|---|---|---|---|---|---|---|---|---|
| 1 | Senseye Sp. z o.o. | Wycena i Sprzedaż Firmy Senseye | Częstochowa | Poland | 2011-09-30 | 11 090 | Slawomir Jurczyk | |
| 2 | F.H.P. Styro-Papex s.c. | Wycena i Sprzedaż Firmy STYRO-PAPEX | Częstochowa | Poland | 2011-08-17 | 10 255 | Wienczyslawa Ptasinska | |
| 3 | Arkadiusz Kumka | Kupno Firmy przez Arkadiusz Kumka | Częstochowa | Poland | 2011-10-01 | 19 079 | ||
| 4 | Connect Telecom Sp z o.o. | Wycena i Sprzedaż Firmy Connect Telecom | Częstochowa | Poland | 2011-08-05 | 954 | Maciej Chlodek | |
| 5 | Nihao Ltd | Nadzór investorski | Częstochowa | Poland | 2010-05-25 | 2011-12-31 | 51 241 | |
| 6 | OLIMP Purchasing Management Sp. z o.o. | Wycena i Sprzedaż Firmy OLIMP | Warszawa | Poland | 2011-11-14 | 2011-12-30 | 2 187 | Krystyna Backiel |
| 7 | Bowen Construction Ltd. | Bandon Grammar School - glazing | Dublin | Ireland | 2009-08-12 | 2010-04-19 | 69 129 | Damian Clifford |
| 8 | John Paul Construction Dublin | Childrens University Hospital - Phase 2 tender | Dublin | Ireland | 2009-11-23 | 2010-04-19 | 140 242 | Eamon Hanlon |
| 9 | P. Elliott & Co. Ltd. Dublin | Irish Times - Additional Works | Dublin | Ireland | 2009-07-01 | 2010-03-31 | 23 882 | Jimmy Magee |
| 10 | Nihao Ltd | Management services for NIHAO LTD | Częstochowa | Poland | 2004-07-21 | 2010-03-31 | 8 111 000 | |
| 11 | Campbell Construction Group | GHA Househillwood External Fabric Year 3, 37-43 Haughburn Road | Glasgow | Scotland | 2010-02-11 | 2010-03-29 | 19 098 | Johnathan Woodhouse |
| 12 | Adroit Group Ltd | Royal Infirmary - Plastics Department - terracotta | Glasgow | Scotland | 2010-01-21 | 2010-03-19 | 26 436 | |
| 13 | Keyclad Ltd | KC1071 Abertay University, Dundee - South Elevation | Dundee City | Scotland | 2009-11-30 | 2010-03-15 | 97 070 | Andrew Lee |
| 14 | Fleming Construction Cork | Additional Glazing for Birmingham Holiday Inn | Birmingham | England | 2010-02-22 | 2010-03-08 | 13 038 | Ian O'Leary |
| 15 | Dandara Ltd | Glasgow Harbour Phase 2 - Additional Works | Glasgow | Scotland | 2009-11-09 | 2010-02-26 | 19 102 | David McKenzie |
| 16 | Pressiton USA | Nadzór investorski | USA | 2007-08-30 | 2010-02-26 | 73 792 | ||
| 17 | Interclub Sp. z o.o. | Nadzór investorski | all | Ukraine | 2008-09-16 | 2010-02-26 | 154 867 | |
| 18 | P. J. Walls Dublin | P. J. Walls Dublin - EWIS FAS Training Centre | Dublin | Ireland | 2009-11-16 | 2010-02-17 | 13 783 | John Delaney |
| 19 | Campbell Construction Group | 161 Lyoncross Road, Glenoaks (Pollok) | Glasgow | Scotland | 2009-12-12 | 2010-02-13 | 12 552 | David Wylie |
| 20 | CS Construction (Scotland) Ltd. | Rosehall extention | all | Scotland | 2010-02-04 | 2010-02-12 | 10 214 | |
| 21 | Campbell Construction Group | 11 Myres Road - stairs at rear door | Glasgow | Scotland | 2008-01-03 | 2010-02-09 | 1 863 | David Wylie |
| 22 | Campbell Construction Group | 60 - 86 Braehead St | Glasgow | Scotland | 2009-12-10 | 2010-01-22 | 76 437 | Brian Buchanan |
| 23 | John Paul Construction Dublin | Childrens University Hospital - glazing - Alternative Constructions | Dublin | Ireland | 2009-10-05 | 2010-01-20 | 47 582 | Eamon Hanlon |
| 24 | Fleming Construction Cork | NUIM North Campus | Mynooth | Ireland | 2009-10-23 | 2010-01-19 | 87 837 | Brian McCarthy |
| 25 | Abbey Building Contractors | Belmont Nursing Home - Glazed canopy | Dublin | Ireland | 2009-04-16 | 2010-01-16 | 82 861 | Peter Doherty |
| 26 | John Paul Construction Dublin | Beacon, EWI | Dublin | Ireland | 2010-01-18 | 2010-01-14 | 850 | David Behan |
| 27 | Bennett (Construction) Ltd. | External Insulated Render System - Mullingar Civic Offices | Dublin | Ireland | 2009-02-09 | 2009-12-31 | 45 376 | Stephen Moran |
| 28 | Speedwell Roofing and Cladding Ltd | LC5 Knowsley Community Learning Centre | Knowsley | England | 2009-05-01 | 2009-12-31 | 416 805 | Ian Durban |
| 29 | Systems Aluminium | Napier University - Sighthill Campus rev | Glasgow | Scotland | 2009-06-08 | 2009-12-15 | 229 646 | Graham Harrison |
| 30 | Michael Murphy & Co Ltd | New Shopfront Adjacent to Whitewater Shopping Centre Newbridge | Dublin | Ireland | 2009-11-30 | 2009-12-14 | 3 637 | |
| 31 | CUPRUM ARENA MGC INWEST Sp. z o.o. Sp. komandytowo-akcyjna | Cuprum Arena - okna EI 60 | Lubin | Poland | 2009-11-02 | 2009-11-30 | 9 | |
| 32 | Williaam Cox Ireland Ltd | DVSC | Cork | Ireland | 2008-10-04 | 2009-11-26 | 214 092 | Colman Murphy |
| 33 | KB Budmax Sp z o.o. | Stadion Victoria Świebodzice - Optolith | Częstochowa | Poland | 2009-10-26 | 2009-11-25 | 21 061 | Szczepan Prokopowicz |
| 34 | FC SPV Żeligowskiego Sp. z o.o. | Lodz - Kamienica, ul. Zeligowskiego | Łódź | Poland | 2009-10-26 | 2009-11-20 | 60 526 | |
| 35 | John Sisk & Son Ltd | Central Park, Leopardstown - Block L | Dublin | Ireland | 2008-05-30 | 2009-11-04 | 129 062 | Michael Brennan |
| 36 | KB Budmax Sp z o.o. | Wictoria Swiebodzice - Aluprof | Częstochowa | Poland | 2009-10-26 | 2009-10-30 | 32 923 | Szczepan Prokopowicz |
| 37 | Levolux A.T. Limited | New Terminal Development - Dublin Airport | Dublin | Ireland | 2009-07-01 | 2009-10-30 | 49 022 | Paul Zaslawski |
| 38 | Fleming Construction Cork | Birmingham Inn - rev | Birmingham | England | 2009-08-10 | 2009-10-30 | 276 145 | Ian O'Leary |
| 39 | Systems Aluminium | Strathclyde University Biomed Building | Glasgow | Scotland | 2009-04-27 | 2009-10-23 | 187 980 | Graham Harrison |
| 40 | Strabag Sp. z o.o. | BMTI - Strabag, Przeróbka drzwi | Gdańsk | Poland | 2009-09-30 | 2009-10-02 | 62 | Agnieszka Szymańska |
| 41 | Janusz Trzepizur | Budynek biurowy JT - elewacje Dryvit - Janusz Trzepizur | Częstochowa | Poland | 2009-06-22 | 2009-09-30 | 25 501 | Janusz Trzepizur |
| 42 | Nieruchomości Grzyb Stachura Sp. jawna | Klonowa - Agrob-Buchtal Optolith | Kielce | Poland | 2009-07-20 | 2009-09-30 | 93 928 | Stanisław Kania |
| 43 | P.P.H.U. ALU-FACH Piotr Mercik | Obserwatorium - Alu - Fach | Częstochowa | Poland | 2009-04-02 | 2009-09-30 | 109 701 | Piotr Mercik |
| 44 | Fleming Construction Cork | Birmingham Holiday Inn - Aluprof Glazing REV2 | Birmingham | England | 2009-08-03 | 2009-09-25 | 188 441 | Ian O'Leary |
| 45 | Tanstarr Ltd. Building Contractors | Church of St. Jude the Apostle | Dublin | Ireland | 2009-08-24 | 2009-09-15 | 14 959 | Sean Walsh |
| 46 | Stone Developments Ltd. | Rowlagh C.U. - Glazing | Dublin | Ireland | 2009-04-30 | 2009-09-15 | 58 637 | John ONeill |
| 47 | OSheas Builders Cork | Knocknaheeny Refurbishment - Block D | Cork | Ireland | 2005-09-01 | 2009-09-15 | 651 788 | Ray Power |
| 48 | Mostostal Warszawa S.A. | Fokus Park Piotrkow Tryb. - KREISEL | Piotrków Trybunalski | Poland | 2009-04-01 | 2009-09-10 | 171 245 | Zbigniew Podkański |
| 49 | Concast | Tallaght Block B | Dublin | Ireland | 2009-04-23 | 2009-09-04 | 1 452 | David Collum |
| 50 | Levolux A.T. Limited | Terminal 2, Dublin Airport | Dublin | Ireland | 2009-07-27 | 2009-09-04 | 50 280 | Paul Zaslawski |
| 51 | P. Elliott & Co. Ltd. Dublin | Irish Times - Insulated Render Weber | Dublin | Ireland | 2009-08-03 | 2009-09-04 | 123 860 | Jimmy Magee |
| 52 | SD Systems 96 | Whitburm Church of England School | all | England | 2008-05-26 | 2009-08-24 | 76 283 | Graeme Handley |
| 53 | Sammon Group | SAMMON GROUP SCHOOLS-MORNINGTON -LCF | Dublin | Ireland | 2009-06-10 | 2009-08-22 | 118 999 | Mark Daly |
| 54 | Speedwell Roofing and Cladding Ltd | LC6 Knowsley Community Learning Centre | Knowsley | England | 2008-07-28 | 2009-08-19 | 410 591 | Ian Durban |
| 55 | Fleming Construction Cork | Wolverhampton - Lock street rev | Wolverhampton | England | 2009-01-08 | 2009-08-14 | 2 210 942 | Ger O'Reilly |
| 56 | Sammon Group | SAMMON GROUP SCHOOLS-MORNINGTON -Additional Work | all | Ireland | 2009-08-04 | 2009-08-07 | 531 | Mark Daly |
| 57 | Fleming Construction Cork | Birmingham Inn - Vision - JUK 9107 | Birmingham | England | 2009-08-05 | 2009-08-07 | 721 | Ian O'Leary |
| 58 | M P Construction Limited | Stephens Green Hotel Extension | Dublin | Ireland | 2009-02-12 | 2009-08-05 | 115 094 | Paul O'Connor |
| 59 | Fleming Construction Cork | Ringaskiddy Cork - Bedroom Windows Revision | Cork | Ireland | 2009-07-03 | 2009-07-23 | 86 005 | Tony Kelly |
| 60 | Strabag Sp. z o.o. | BMTI - Strabag | Kowale | Poland | 2008-12-08 | 2009-07-16 | 21 661 | Agnieszka Szymańska |
| 61 | Stone Developments Ltd. | Rowlagh C.U. | Dublin | Ireland | 2009-04-30 | 2009-07-11 | 16 764 | John ONeill |
| 62 | John Sisk & Son Ltd | Central Park, Leopardstown - Block F | Dublin | Ireland | 2008-01-01 | 2009-06-27 | 62 295 | Michael Brennan |
| 63 | PORTOS Renata, Tomasz Szukalscy Spółka Jawna | Portos - elewacje | Kalisz | Poland | 2009-03-30 | 2009-06-12 | 124 010 | Tomasz Szukalski |
| 64 | Bennett (Construction) Ltd. | Grange Castle Business Park | Dublin | Ireland | 2008-06-20 | 2009-06-11 | 11 970 | Gerald Ward |
| 65 | Systems Aluminium | PRESTWICK - NATS | Glasgow | Scotland | 2009-05-05 | 2009-06-04 | 1 586 | Graham Harrison |
| 66 | Abbey Building Contractors | Belmont Nursing Home - Structural Glazing | Dublin | Ireland | 2008-11-07 | 2009-05-31 | 139 355 | Peter Doherty |
| 67 | Abbey Building Contractors | Belmont Nursing Home | Dublin | Ireland | 2008-11-07 | 2009-05-31 | 311 770 | Peter Doherty |
| 68 | Nihao Ltd | Belmont Nursing Home - Structural Glazing | Częstochowa | Poland | 2009-04-03 | 2009-05-30 | 52 408 | Andrzej Kowalczyk |
| 69 | Stone Developments Ltd. | Central Park Block G - Aluminium Flashings | Dublin | Ireland | 2009-05-04 | 2009-05-29 | 2 216 | John ONeill |
| 70 | Janusz Trzepizur | Budynek biurowy JT - Janusz Trzepizur | Częstochowa | Poland | 2009-05-01 | 2009-05-29 | 16 134 | Janusz Trzepizur |
| 71 | CUPRUM ARENA MGC INWEST Sp. z o.o. Sp. komandytowo-akcyjna | Cuprum Arena - okna dyrekcji poz +3 | Lubin | Poland | 2009-04-29 | 2009-05-15 | 6 201 | |
| 72 | Campbell Construction Group | GHA New Shaws Rossendale rd/Greenviw rd/Christian rd | Glasgow | Scotland | 2008-02-04 | 2009-05-07 | 550 866 | Johnathan Woodhouse |
| 73 | Michael McNamara & Co. Dublin | Blanchardstown Apartments - Rainscreen System | Dublin | Ireland | 2009-01-26 | 2009-05-04 | 587 758 | Sean Lineen |
| 74 | Campbell Construction Group | CCG Muiskeith Road 2 - Balcony | Scotland | 2009-04-15 | 2009-04-27 | 841 | ||
| 75 | Campbell Construction Group | Ashmore Road Shops | Glasgow | Scotland | 2009-03-16 | 2009-04-27 | 13 739 | Paul Muldoon |
| 76 | Campbell Construction Group | Bowfield Phase 2 | Glasgow | Scotland | 2009-02-25 | 2009-04-14 | 26 388 | Paul Muldoon |
| 77 | M P Construction Limited | Willow Park Junior School | Dublin | Ireland | 2009-05-11 | 2009-04-12 | 165 097 | Martin Walshe |
| 78 | John Sisk & Son Ltd. Cork | Dunnes Stores, Patrick Street | Cork | Ireland | 2008-09-15 | 2009-04-12 | 549 220 | Tony Long |
| 79 | Cleary and Doyle Contracting Limited | Dennehys Cross - Mixed Residential Development | Cork | Ireland | 2008-11-20 | 2009-04-12 | 853 265 | Derek Ahern |
| 80 | Dandara Ltd | Glasgow Harbour Phase 2 - terracotta cladding | Glasgow | Scotland | 2008-09-08 | 2009-04-10 | 95 548 | David McKenzie |
| 81 | Concast | Tallaght, Whitegate Admin Bldg. | Dublin | Ireland | 2009-03-19 | 2009-04-07 | 12 579 | David Collum |
| 82 | Randalswood Construction LTD | Duke Row Development External Wall Insulation IAB Cert. No 06/0260 | Dublin | Ireland | 2008-09-30 | 2009-04-05 | 135 413 | Chris Gaffney |
| 83 | Campbell Construction Group | CCG - Bowfield Bin Stores G0021 | Glasgow | Scotland | 2009-03-20 | 2009-04-03 | 10 280 | Paul Muldoon |
| 84 | CUPRUM ARENA MGC INWEST Sp. z o.o. Sp. komandytowo-akcyjna | Cuprum Arena - Atrium | Częstochowa | Poland | 2009-03-26 | 2009-04-03 | 10 911 | |
| 85 | CUPRUM ARENA MGC INWEST Sp. z o.o. Sp. komandytowo-akcyjna | Cuprum Arena - prace dodatkowe-Prestiż MGC | Lubin | Poland | 2009-03-03 | 2009-04-01 | 9 261 | |
| 86 | Concast | Tallaght Block C /05-062/ 08-13 | Dublin | Ireland | 2008-09-03 | 2009-03-31 | 31 951 | David Collum |
| 87 | Clancy Construction Tipperary | Thurles Shopping Centre - Optolith System | Tipperary | Ireland | 2008-10-06 | 2009-03-22 | 285 660 | Alan Darmody_2 |
| 88 | Campbell Construction Group | Old Pollok Mansards; side 2 | Glasgow | Scotland | 2008-09-15 | 2009-03-20 | 53 270 | Paul Muldoon |
| 89 | P. J. Walls Dublin | 1827 Boyne Shopping Centre Drogheda | Dublin | Ireland | 2009-02-01 | 2009-03-16 | 166 466 | John Delaney |
| 90 | South Dublin Construction Limited, | 08/056-3 Green Park Churchtown | Dublin | Ireland | 2008-10-20 | 2009-03-10 | 51 590 | John Cullen |
| 91 | CUPRUM ARENA MGC INWEST Sp. z o.o. Sp. komandytowo-akcyjna | Cuprum Arena - dodatkowe fasady - Prestiż MGC | Lubin | Poland | 2009-02-09 | 2009-02-28 | 20 271 | |
| 92 | Concast | Grangeford Office & Factory - External Rendering - Phase II | Dublin | Ireland | 2005-05-02 | 2009-02-20 | 667 | Paul Whelan |
| 93 | John Sisk & Son Ltd | Charlesland Apartments Project | Dublin | Ireland | 2005-04-25 | 2009-02-20 | 185 000 | Richard Morrisey |
| 94 | CUPRUM ARENA MGC INWEST Sp. z o.o. Sp. komandytowo-akcyjna | Cuprum Arena - drzwi - Prestiz MGC | Lubin | Poland | 2009-01-12 | 2009-02-12 | 44 268 | |
| 95 | CUPRUM ARENA MGC INWEST Sp. z o.o. Sp. komandytowo-akcyjna | Cuprum Arena - fasady wewnętrzne- Prestiz MGC | Lubin | Poland | 2009-01-12 | 2009-02-12 | 171 708 | |
| 96 | P.P.H.U PERFEKT Janusz Albrycht | Janusz Albrycht - Janusz Albrycht | Częstochowa | Poland | 2009-02-03 | 2009-02-03 | 1 080 | Janusz Albrycht |
| 97 | Ironson Ltd. Build Service | Dom Petera- Ironson | Częstochowa | Poland | 2008-12-01 | 2009-01-15 | 25 430 | Marcin Synowiec |
| 98 | Witold Rudecki | Dom Witolda Rudeckiego - Architektonika | Częstochowa | Poland | 2008-12-11 | 2008-12-15 | 8 180 | Witold Rudecki |
| 99 | Grainger Building Services Ltd | Union Square Aberdeen | Aberdeen | Scotland | 2008-09-15 | 2008-12-12 | 96 377 | Frank Kelly |
| 100 | Przedsiębiorstwo Wielobranżowe DAREX Dariusz Przedpełski | Darex Toruń - DAREX | Toruń | Poland | 2008-12-01 | 2008-12-06 | 10 769 | Dariusz Przedpełski |
| 101 | Manley Construction Ltd | Millennium Business Park Coffee Shop | Dublin | Ireland | 2008-10-30 | 2008-12-03 | 23 767 | Martin Murray |
| 102 | Michael McNamara & Co. Dublin | Elm Park Development - Hotel | Dublin | Ireland | 2007-10-18 | 2008-12-02 | 36 500 | Ed McNamara |
| 103 | McKean Building & Civil Engineering | Mezzanine Car Park, Cotton St. Paisley | Glasgow | Scotland | 2008-10-31 | 2008-11-22 | 46 295 | Martin Sweeney |
| 104 | Cleary and Doyle Contracting Limited | Retail and Residential Development, Portland Street North - Additional Works | Dublin | Ireland | 2008-09-16 | 2008-11-14 | 10 320 | Kieran Walsh |
| 105 | Ellen Construction Ltd. | Commercial/ Residential Development at East Road, Dublin 3 - Blk 2,3,4 - PTS | Dublin | Ireland | 2008-03-07 | 2008-11-12 | 111 427 | Eugene Cullen |
| 106 | Bennett (Construction) Ltd. | Ballymun Apartments Dublin | Dublin | Ireland | 2005-09-30 | 2008-11-10 | 789 169 | Kevin Kelly |
| 107 | Patton Group (Dublin Office) | Donore Road Drogheda - Tesco Offices; Coffee Shop | Dublin | Ireland | 2008-06-02 | 2008-11-01 | 160 000 | Gerrard Sloan |
| 108 | Park Developments Dublin | The Park Carrickmines | Dublin | Ireland | 2008-11-14 | 2008-10-31 | 26 525 | Russell Treacy |
| 109 | Campbell Construction Group | Castlemilk - BrickSlips | Glasgow | Scotland | 2008-10-01 | 2008-10-08 | 7 210 | |
| 110 | Opus Developments | Residental Development, Cornerpark - Dayworks | Dublin | Ireland | 2006-07-04 | 2008-09-30 | 567 463 | Claire Crone |
| 111 | NCC Construction Lund | NCC/STP | Lund | Sweden | 2008-05-01 | 2008-09-13 | 14 937 | Martin Szepczynski |
| 112 | P.U.H. Tepix - Tadeusz Piaszczyk | Biurowiec firmy Tepix - elewacje - Tepix | Częstochowa | Poland | 2008-08-01 | 2008-09-12 | 14 737 | Tadeusz Piaszczyk |
| 113 | Domado Technic Jan Dobrowolski | Domado Technic - dodatkowe konstrukcje - Domado Technic | Częstochowa | Poland | 2008-08-26 | 2008-09-05 | 5 283 | Jan Dobrowolski |
| 114 | Domado Technic Jan Dobrowolski | Budynek magazynowy DOMADO TECHNIC - Domado Technic | Częstochowa | Poland | 2008-06-24 | 2008-09-05 | 22 556 | Jan Dobrowolski |
| 115 | Grainger Building Services Ltd | Morrison Granton - Superstore building | Edinburgh | Scotland | 2008-05-20 | 2008-08-22 | 41 758 | Frank Kelly |
| 116 | Przedsiębiorstwo Budownictwa Usług i Handlu WESTBUD Sp. z o.o. | Uniwersytet Wrocławski - Westbud | Wrocław | Poland | 2008-05-30 | 2008-07-31 | 38 330 | Krzysztof Szymański |
| 117 | P.J. Hegarty and Sons Cork | The Elysian, Eglinton Street; Weber Therm 120mm XM PTS | Cork | Ireland | 2007-09-20 | 2008-07-31 | 2 609 351 | Donal O Shea |
| 118 | Calvin Contracts | Q5 Buildings, Quartermile, Edinburgh | Edinburgh | Scotland | 2008-01-14 | 2008-07-23 | 78 598 | Colin McAlinden |
| 119 | Grainger Building Services Ltd | Morrison Granton - Student accomodation building | Edinburgh | Scotland | 2008-02-11 | 2008-07-22 | 76 539 | Frank Kelly |
| 120 | Campbell Construction Group | GHA Levernside rd - shops | Glasgow | Scotland | 2008-02-25 | 2008-06-13 | 54 713 | David Wylie |
| 121 | John Paul Construction Cork | Mitchelstown Medical Centre | Mitchelstown | Ireland | 2008-04-28 | 2008-05-31 | 145 059 | |
| 122 | P.U.H. Tepix - Tadeusz Piaszczyk | Biurowiec firmy Tepix - Tepix | Częstochowa | Poland | 2008-03-17 | 2008-05-30 | 15 020 | Tadeusz Piaszczyk |
| 123 | Mythen Construction Ltd. | Ferrybank Swimming Pool | Wexford | Ireland | 2009-02-27 | 2008-05-30 | 48 960 | Sean Roche |
| 124 | John Paul Construction Dublin | Ferrybank Shopping Centre | Waterford | Ireland | 2008-02-04 | 2008-05-30 | 871 400 | Gerry Brennan |
| 125 | SD Systems 96 | Facade Elevation E | Glasgow | Scotland | 2008-05-21 | 2008-05-26 | 2 267 | Graeme Handley |
| 126 | Willow Park Contracting Ltd. | North Star Hotel - Weber.therm M1 | Dublin | Ireland | 2008-02-25 | 2008-05-24 | 62 900 | Alan Walshe |
| 127 | Nexus Homes | Residential Development at Robin Hill - Weber Therm XM PTS 130mm EPS | Sandyford | Ireland | 2007-10-08 | 2008-05-18 | 386 669 | Tom McEvaddy |
| 128 | Costello Construction | Vernon Avenue Renovations | Dublin | Ireland | 2008-04-07 | 2008-05-02 | 30 626 | |
| 129 | John Paul Construction Dublin | Dundrum Business Park - External Render New Building | Dublin | Ireland | 2008-02-04 | 2008-04-30 | 97 762 | Michael Wogerbauer |
| 130 | Campbell Construction Group | Leithland Rd - Structherm system | Glasgow | Scotland | 2008-02-11 | 2008-04-26 | 26 261 | David Wylie |
| 131 | SD Systems 96 | Tarbert | all | Scotland | 2008-04-19 | 2008-04-19 | 781 | Graeme Handley |
| 132 | Cleary and Doyle Contracting Limited | Retail and Residential Development, Portland Street North- Weber Therm 120mm XM PTS | Dublin | Ireland | 2007-06-20 | 2008-04-19 | 1 040 000 | Kieran Walsh |
| 133 | SD Systems 96 | Inveraray Primary School | Glasgow | Scotland | 2008-04-08 | 2008-04-17 | 5 125 | Graeme Handley |
| 134 | Window Management Limited | Springhill Business Village, Glasgow | Glasgow | Scotland | 2007-10-17 | 2008-04-12 | 45 089 | Graeme Handley |
| 135 | Campbell Construction Group | Old Pollok year 3 | Glasgow | Scotland | 2007-06-29 | 2008-04-11 | 187 921 | David Wylie |
| 136 | Campbell Construction Group | CCG - SHIELDS DW/Z0570 | Glasgow | Scotland | 2008-04-01 | 2008-04-05 | 1 090 | David Wylie |
| 137 | Ironson Ltd. Build Service | IronSon - świetlik płaski marzec- Londyn - IronSon | Częstochowa | Poland | 2008-03-24 | 2008-04-04 | 1 099 | Marcin Synowiec |
| 138 | Danninger Limited | Tallaght New Town Centre, BLOCK E - EXTRA WORK | Dublin | Ireland | 2008-03-04 | 2008-03-31 | 963 | Stephen McGrath |
| 139 | John Sisk & Son Ltd | Dundrum Notre Dame - Additional Works | Dublin | Ireland | 2008-01-28 | 2008-03-31 | 1 486 | |
| 140 | Glenkerrin Homes Ltd. | The Grange Oficces Development | Dublin | Ireland | 2008-02-18 | 2008-03-20 | 81 612 | Onno Masson |
| 141 | Michael McNamara & Co. Dublin | Elm Park Development - Gas Station | Dublin | Ireland | 2008-03-11 | 2008-03-19 | 4 534 | |
| 142 | McCabe Builders | The Forum Apartments Sandyford | Dublin | Ireland | 2006-05-10 | 2008-03-06 | 701 892 | Richard McCarthy |
| 143 | McInerney Contracting Dublin Ltd | The Chase Office Development | Dublin | Ireland | 2008-02-04 | 2008-03-01 | 351 102 | Hugh Mockler |
| 144 | John Sisk & Son Ltd. Cork | Georges Quay Development; EWIS | Cork | Ireland | 2008-02-04 | 2008-02-29 | 78 600 | James Mulcahy |
| 145 | John Sisk & Son Ltd | 21 Corrig Road, Sundyford - Weber Therm XL and XM PTS 120mm | Dublin | Ireland | 2007-09-24 | 2008-02-29 | 273 376 | Julia Moran |
| 146 | Aragone Ltd, C/o Bruce Project Services Ltd. | Liffey Trust Project - External Render | Dublin | Ireland | 2007-09-24 | 2008-02-29 | 381 595 | Pat McDevitt |
| 147 | Danninger Limited | Tallaght Town Centre Belgard Square West (hotel) | Tallaght | Ireland | 2007-05-23 | 2008-02-29 | 1 451 596 | Stephen McGrath |
| 148 | Danninger Limited | Tallaght New Town Centre 2 | Dublin | Ireland | 2006-10-04 | 2008-02-29 | 1 588 102 | Damien O Connor |
| 149 | Ellen Construction Ltd. | Fairview Block C - PTS | Dublin | Ireland | 2007-12-10 | 2008-02-22 | 199 465 | Martin Murphy |
| 150 | Ironson Ltd. Build Service | Ironson - świetliki - Londyn -Ironson | Częstochowa | Poland | 2008-02-05 | 2008-02-20 | 4 505 | Marcin Synowiec |
| 151 | Concast | Grangeford OFF SITE - Naas | Dublin | Ireland | 2008-01-30 | 2008-02-16 | 16 000 | Paul Whelan |
| 152 | Campbell Construction Group | 58 Raithburn Av Castlemilk | Glasgow | Scotland | 2008-01-07 | 2008-02-08 | 33 639 | David Wylie |
| 153 | Campbell Construction Group | 462 Caledonia Road | Glasgow | Scotland | 2007-11-05 | 2008-01-31 | 17 046 | David Wylie |
| 154 | Coldcut Partnership | Richie Maguire (Brooklands) - Weber Therm XM PTS 120mm EPS | Dublin | Ireland | 2007-12-13 | 2008-01-31 | 884 092 | Richie Maguire |
| 155 | Danninger Limited | Tallaght Town Centre Belgard Square West (hotel) - Bar | Dublin | Ireland | 2007-09-28 | 2008-01-28 | 107 000 | Stephen McGrath |
| 156 | Ferrovial Agroman Ireland LTD | Ballyfermot Leisure and Youth Centre Project - External Wall Render | Dublin | Ireland | 2007-03-01 | 2008-01-18 | 406 561 | Oisin Ruane |
| 157 | Campbell Construction Group | GHA Househillwood External Fabric Year 3 | Glasgow | Scotland | 2006-11-13 | 2008-01-18 | 762 642 | Johnathan Woodhouse |
| 158 | Przedsiębiorstwo Budownictwa Usług i Handlu WESTBUD Sp. z o.o. | Osiedle Obrońców Poczty Gdańskiej - Westbud | Wrocław | Poland | 2007-12-07 | 2007-12-21 | 4 575 | Zbigniew Smoleń |
| 159 | Costello Construction | The Strand | Dublin | Ireland | 2006-01-09 | 2007-12-11 | 198 959 | Konrad Swierczyński |
| 160 | John Sisk & Son Ltd | Mulvey Centre Carrick On Shannon; Weber Therm XM 60mm Phenolic | Carrick-on-Shannon | Ireland | 2007-04-18 | 2007-11-26 | 741 626 | Jason Flynn |
| 161 | Concast | Kilmainham - Rendering Panels | Dublin | Ireland | 2006-06-15 | 2007-10-30 | 132 197 | Paul Whelan |
| 162 | Michael McNamara & Co. Dublin | Elm Park Development - RB2 Residential Buildings | Dublin | Ireland | 2007-03-20 | 2007-10-25 | 280 000 | Ed McNamara |
| 163 | Campbell Construction Group | Old Pollok - Mansards | Glasgow | Scotland | 2007-10-01 | 2007-10-19 | 7 341 | Paul Muldoon |
| 164 | Campbell Construction Group | 129 Neilsland Oval | Glasgow | Scotland | 2007-10-15 | 2007-10-17 | 1 066 | David Wylie |
| 165 | Window Management Limited | Craighall Unit 3a and 3b, Glasgow City Centre | Glasgow | Scotland | 2007-08-09 | 2007-10-15 | 10 419 | Graeme Handley |
| 166 | Costello Construction | Howth Junction | Dublin | Ireland | 2007-09-24 | 2007-10-14 | 47 441 | Konrad Swierczyński |
| 167 | Michael McNamara & Co. Dublin | Blackrock College | Dublin | Ireland | 2006-10-16 | 2007-10-09 | 137 249 | Sean Lineen |
| 168 | McInerney Holdings plc | Anglesea Road - Weber Therm XM PTC | Dublin | Ireland | 2006-12-18 | 2007-10-05 | 14 026 | Padraic Mollahan |
| 169 | Campbell Construction Group | Ardberg 9 | Glasgow | Scotland | 2007-09-28 | 2007-10-03 | 1 416 | David Wylie |
| 170 | Michael McNamara & Co. Dublin | Blanchardstown Apartments - External Render-Additional works | Dublin | Ireland | 2007-09-19 | 2007-09-30 | 14 239 | Sean Lineen |
| 171 | Concast | Grangeford Off Site - Notre Dame Convent | Dublin | Ireland | 2007-09-03 | 2007-09-27 | 17 932 | Paul Whelan |
| 172 | John Paul Construction Dublin | Dundrum Business Park - Existing Building and Extension | Dublin | Ireland | 2007-08-22 | 2007-09-27 | 50 061 | Michael Wogerbauer |
| 173 | John Sisk & Son Ltd | Ossory Road - Block C | Dublin | Ireland | 2006-08-08 | 2007-09-26 | 167 904 | Martin Conway |
| 174 | John Sisk & Son Ltd | Ossory Road - Crosbies Yard - External Render | Dublin | Ireland | 2006-03-02 | 2007-09-25 | 844 343 | Martin Conway |
| 175 | McInerney Contracting Dublin Ltd | Bow Lane Supported Housing - Weber Therm XM PTS 100mm Mineral Fibre | Dublin | Ireland | 2007-03-16 | 2007-09-23 | 98 541 | Enda OReilly |
| 176 | South Dublin Construction Limited, | Waltrim Grove Bray | Dublin | Ireland | 2007-08-01 | 2007-09-21 | 17 372 | John Cullen |
| 177 | SD Systems 96 | George Watson (Edinburgh) | Edinburgh | Scotland | 2007-09-17 | 2007-09-19 | 1 346 | Graeme Handley |
| 178 | SD Systems 96 | J.Sainsbury (Edinburgh) | Edinburgh | Scotland | 2007-09-03 | 2007-09-17 | 5 047 | Graeme Handley |
| 179 | G and T Crampton | Charlestown Centre - Weber Therm XM PTC Fibre Slab with Acrylic Finish | Dublin | Ireland | 2007-04-16 | 2007-09-17 | 1 106 056 | Damian Gallagher |
| 180 | SD Systems 96 | Largs Academy (Largs) | Largs | Scotland | 2007-08-31 | 2007-09-14 | 2 124 | Graeme Handley |
| 181 | SD Systems 96 | St Mary Prep School (Melrose) | Glasgow | Scotland | 2007-09-04 | 2007-09-12 | 2 444 | Graeme Handley |
| 182 | Michael McNamara & Co. Dublin | Elm Park Development - OBC - Polish Plaster | Dublin | Ireland | 2007-04-16 | 2007-09-06 | 102 921 | Ed McNamara |
| 183 | Concast | Bray - additional job | Dublin | Ireland | 2007-06-06 | 2007-09-04 | 7 800 | Paul Whelan |
| 184 | Bennett (Construction) Ltd. | Plot 25 | Dublin | Ireland | 2006-06-15 | 2007-08-31 | 62 892 | Kevin Kelly |
| 185 | Campbell Construction Group | Branchton Roofs | Glasgow | Scotland | 2007-07-02 | 2007-08-28 | 5 191 | David Wylie |
| 186 | PWM Contracts Ltd. | Dumbarton - labour only | Glasgow | Scotland | 2007-08-20 | 2007-08-24 | 1 199 | Paul Muldoon |
| 187 | Concast | Royal Canal Park Pelletstown - Patching - Phase II | Dublin | Ireland | 2006-05-02 | 2007-08-24 | 88 125 | Paul Whelan |
| 188 | McInerney Contracting Dublin Ltd | Apartment Development at Irishtown Road; Expomesh System; Polystyrene 120mm | Dublin | Ireland | 2006-02-28 | 2007-08-24 | 484 322 | |
| 189 | Recast Rendering | 30 Invercyle Cardonald - pointing labour only | Glasgow | Scotland | 2007-06-21 | 2007-08-22 | 8 731 | Michael Burke |
| 190 | Campbell Construction Group | GHA Old Pollok | Glasgow | Scotland | 2006-10-02 | 2007-08-11 | 133 850 | David Wylie |
| 191 | Michael McNamara & Co. Dublin | Elm Park Development - Senior Housing - Weber Therm XM PTC 100mm Fibre Slab | Dublin | Ireland | 2007-01-08 | 2007-08-10 | 297 250 | Ed McNamara |
| 192 | Michael McNamara & Co. Dublin | Elm Park Development - RB2 - K10+ / Promat TL Board - tape and joint | Dublin | Ireland | 2007-04-30 | 2007-08-09 | 11 299 | Ed McNamara |
| 193 | Michael McNamara & Co. Dublin | Elm Park Development - Lift Surround Canopy and Flashing Postboxes | Dublin | Ireland | 2007-07-02 | 2007-08-09 | 42 577 | Ed McNamara |
| 194 | Kingspan Fabrik Ltd. | Fas Training Centre Tallaght | Dublin | Ireland | 2006-09-11 | 2007-07-27 | 59 148 | David Tyndall |
| 195 | McKelan Construction | HaFele Ireland - 1066 Frame System | Dublin | Ireland | 2007-03-01 | 2007-07-25 | 68 782 | Frank Brett |
| 196 | Concast | Grangeford OFF SITE - Royal Canal Park Rendering Panels Ph. II; Kilmainham; Tallaght | Dublin | Ireland | 2005-10-27 | 2007-07-12 | 423 250 | Paul Whelan |
| 197 | Michael McNamara & Co. Dublin | Elm Park Development - RB2 Residential Buildings - boxing | Dublin | Ireland | 2007-05-17 | 2007-07-11 | 35 404 | Ed McNamara |
| 198 | Concast | Grangeford OFF SITE - Ballywaltrim - Rendering Panels Phase II | Dublin | Ireland | 2007-05-03 | 2007-07-11 | 58 350 | Paul Whelan |
| 199 | Michael McNamara & Co. Dublin | Hotel Killeshin | Dublin | Ireland | 2006-09-07 | 2007-06-29 | 466 543 | James Godley |
| 200 | Danninger Limited | Tallaght New Town Centre | Dublin | Ireland | 2005-11-05 | 2007-06-28 | 2 571 764 | Damien O Connor |
| 201 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks - Internal Works | Dublin | Ireland | 2005-05-23 | 2007-06-18 | 286 867 | Claire Crone |
| 202 | Campbell Construction Group | Old Pollock Ext Fabric Yr2 - Garden Walls | Glasgow | Scotland | 2007-06-11 | 2007-06-12 | 1 381 | David Wylie |
| 203 | Window Management Limited | Charles St Townhead Glasgow - labour only, window instalation | Glasgow | Scotland | 2007-05-18 | 2007-06-04 | 3 005 | David Morrison |
| 204 | Campbell Construction Group | 21, 23 and 27 Rosneath Street, Govan | Glasgow | Scotland | 2007-05-16 | 2007-05-28 | 11 718 | David Wylie |
| 205 | Aragone Ltd, C/o Bruce Project Services Ltd. | Liffey Valey Trust Project - Internal Works | Dublin | Ireland | 2007-05-21 | 2007-05-24 | 10 447 | Pat McDevitt |
| 206 | Campbell Construction Group | GHA - Pollokshaws Road - Fixing Isoklinker panels - Labour Only | Glasgow | Scotland | 2006-08-28 | 2007-05-17 | 59 280 | David Wylie |
| 207 | John Sisk & Son Ltd | Ossory Road - Crosbies Yard - Mastic Sealant | Dublin | Ireland | 2007-01-15 | 2007-05-15 | 5 986 | Martin Conway |
| 208 | PWM Contracts Ltd. | Queenslie - Council Blocks | Glasgow | Scotland | 2007-05-01 | 2007-05-15 | 10 083 | Paul Muldoon |
| 209 | Danninger Limited | Tallaght New Town Centre - Finish to side wall of ramp and finish to staircases | Dublin | Ireland | 2006-07-03 | 2007-05-09 | 372 868 | Damien O Connor |
| 210 | McInerney Contracting Dublin Ltd | Red Oak Development - Leopardstown - Dublin | Dublin | Ireland | 2006-07-07 | 2007-05-05 | 230 000 | Hugh Mockler |
| 211 | Concast | Concast - External Patching in Tallaght (Park Development Site) | Dublin | Ireland | 2006-10-03 | 2007-05-01 | 6 000 | Paul Whelan |
| 212 | Michael Fitzgerald & Sons LTD | Station Road, Leixlip - Block E,F and H - External Render | Dublin | Ireland | 2006-08-21 | 2007-04-30 | 185 022 | Ambrose Lynam |
| 213 | Alcrete Ltd | Killmessan Modifications to live-work and commercial units - Weber Therm XM PTS 100mm Phenolic | Dublin | Ireland | 2007-04-27 | 2007-04-27 | 77 230 | Robert Hickey |
| 214 | Michael Fitzgerald & Sons LTD | Station Road, Leixlip - Brick Panels | Dublin | Ireland | 2006-03-18 | 2007-04-21 | 33 837 | Ambrose Lynam |
| 215 | Michael Fitzgerald & Sons LTD | Residential Development Leixlip - Block E,F and H - Taping and Jointing | Dublin | Ireland | 2006-08-09 | 2007-04-20 | 342 786 | Ambrose Lynam |
| 216 | Michael Fitzgerald & Sons LTD | Station Road, Leixlip - Block A,B and C - External Render | Dublin | Ireland | 2005-11-01 | 2007-04-18 | 300 550 | Ambrose Lynam |
| 217 | Kingspan Fabrik Ltd. | Panels Fixings - Labour Only | Dublin | Ireland | 2006-11-07 | 2007-04-03 | 62 893 | |
| 218 | Window Management Limited | Welfarebuilding and Gatehouse - Windows (labour only) | Glasgow | Scotland | 2007-03-20 | 2007-03-26 | 2 079 | David Morrison |
| 219 | Window Management Limited | Window Instalation in Aberdeen (Labour only) | Aberdeen | Scotland | 2007-03-22 | 2007-03-22 | 733 | David Morrison |
| 220 | Campbell Construction Group | GHA - Surrey Street - Fixing Isoklinker panels - Labour Only | Glasgow | Scotland | 2006-12-01 | 2007-03-16 | 13 256 | David Wylie |
| 221 | Campbell Construction Group | GHA Auldhouse Eastwood | Glasgow | Scotland | 2006-10-09 | 2007-02-28 | 218 320 | David Wylie |
| 222 | Michael McNamara & Co. Dublin | Blanchardstown Apartments - External Render | Dublin | Ireland | 2005-11-05 | 2007-02-28 | 495 136 | Sean Lineen |
| 223 | McCabe Builders | The Rath Hotel Ashbourne - Curved Ceiling | Dublin | Ireland | 2006-10-11 | 2007-02-20 | 131 616 | Anthony Joyce |
| 224 | Ormond Building Products | Barrow Street; Gebrik | Dublin | Ireland | 2003-01-01 | 2007-02-15 | 121 760 | Andrew Lewis |
| 225 | Rogerson Reddan and Associates | Repairs and Maintenance to Offices at 78 Haddington Road | Dublin | Ireland | 2007-02-01 | 2007-02-03 | 2 503 | Peter Walshe |
| 226 | Campbell Construction Group | GHA - Cavendish Street - Fixing Isoklinker panels - Labour Only | Glasgow | Scotland | 2006-09-25 | 2007-01-31 | 12 598 | David Wylie |
| 227 | Bukama | Extension & Alterations to 78 Haddington Road | Dublin | Ireland | 2005-10-27 | 2007-01-31 | 166 687 | Peter Walshe |
| 228 | Campbell Construction Group | GHA Braehead St/Caledonia Rd - Pointing of bricks - Labour Only | Glasgow | Scotland | 2006-05-19 | 2007-01-17 | 48 546 | David Wylie |
| 229 | McCabe Builders | The Rath Hotel Ashbourne | Dublin | Ireland | 2006-08-15 | 2006-12-12 | 105 059 | Anthony Joyce |
| 230 | Concast | New Irish Town | Dublin | Ireland | 2006-01-21 | 2006-11-25 | 53 507 | Paul Whelan |
| 231 | Michael Fitzgerald & Sons LTD | Residential Development Leixlip - Block D and G - Taping and Jointing | Dublin | Ireland | 2006-01-23 | 2006-11-24 | 213 338 | John Hynes |
| 232 | Campbell Construction Group | GHA Househillwood - Househillmuir Crescen 20 | Glasgow | Scotland | 2006-11-08 | 2006-11-13 | 7 716 | David Wylie |
| 233 | Campbell Construction Group | GHA Greenview Street | Glasgow | Scotland | 2006-08-09 | 2006-11-11 | 90 143 | David Wylie |
| 234 | J P Homes Ltd | Camden Street | Dublin | Ireland | 2006-08-18 | 2006-11-08 | 44 056 | Edna Joyce |
| 235 | Campbell Construction Group | GHA New Shows Stoneside Square | Glasgow | Scotland | 2006-04-06 | 2006-10-07 | 108 905 | David Wylie |
| 236 | Campbell Construction Group | GHA Househillwood External Fabric Phase 2 | Glasgow | Scotland | 2006-01-23 | 2006-09-23 | 127 143 | David Wylie |
| 237 | Michael Fitzgerald & Sons LTD | Station Road, Leixlip - Block D and G - External Render | Dublin | Ireland | 2006-02-04 | 2006-08-31 | 263 299 | Ambrose Lynam |
| 238 | Campbell Construction Group | GHA Househillwood External Fabric Phase 4 | Glasgow | Scotland | 2006-06-02 | 2006-07-31 | 54 643 | David Wylie |
| 239 | Campbell Construction Group | GHA Househillwood External Fabric Phase 3 | Glasgow | Scotland | 2006-03-01 | 2006-07-31 | 129 531 | David Wylie |
| 240 | Fusion Building Systems Ltd. | Internal Works - boarding and skimming | Dublin | Ireland | 2006-06-09 | 2006-07-15 | 38 985 | Mark Hand |
| 241 | Concast | Limerick - Car Park Mary Street - Patching | Dublin | Ireland | 2006-06-21 | 2006-06-30 | 6 674 | Paul Whelan |
| 242 | Campbell Construction Group | SLC Murray External Fabric Repairs Heatherykonwe 19-29 | Glasgow | Scotland | 2006-04-03 | 2006-06-30 | 9 111 | David Wylie |
| 243 | Campbell Construction Group | SLC Murray External Fabric Repairs Heatherykonwe 43-65 | Glasgow | Scotland | 2006-04-27 | 2006-06-30 | 19 940 | David Wylie |
| 244 | Bennett (Construction) Ltd. | Lusk Project | Dublin | Ireland | 2005-08-05 | 2006-06-27 | 338 025 | Gerald Ward |
| 245 | Concast | Rendering Panels on Park Developments Ltd site | Dublin | Ireland | 2006-06-22 | 2006-06-26 | 5 430 | Paul Whelan |
| 246 | Campbell Construction Group | SLC Murray Seyton Lane Repairing | Glasgow | Scotland | 2006-05-22 | 2006-06-22 | 9 676 | David Wylie |
| 247 | BAM Building Cork Ltd | Cleeve Hill Office Development | Dublin | Ireland | 2006-03-13 | 2006-06-21 | 54 383 | Tom Vaughan |
| 248 | Campbell Construction Group | SLC Murray External Repairs Mungo Park II | Glasgow | Scotland | 2006-02-22 | 2006-06-20 | 17 906 | David Wylie |
| 249 | Campbell Construction Group | SLC East Main External Fabric Repairs Markethill Road 42-52 | Glasgow | Scotland | 2006-04-10 | 2006-06-05 | 11 882 | David Wylie |
| 250 | Bennett (Construction) Ltd. | Suspended Ceiling Insulation | Dublin | Ireland | 2006-01-20 | 2006-05-29 | 23 162 | Stephen Moran |
| 251 | Michael McNamara & Co. Dublin | LVH Leisure Centre - Suspended Ceiling | Dublin | Ireland | 2005-02-08 | 2006-05-26 | 171 028 | Kevin O'Connor |
| 252 | Campbell Construction Group | SLC West Mains External Fabric Repairs Dryburgh Hill | Glasgow | Scotland | 2006-03-03 | 2006-05-18 | 17 617 | David Wylie |
| 253 | Campbell Construction Group | SLC West Mains External Fabric Repairs Tantallon Park | Glasgow | Scotland | 2006-03-20 | 2006-05-17 | 18 582 | David Wylie |
| 254 | Concast | Ballymun - Precast Panels - Mastic and Render | Dublin | Ireland | 2004-11-10 | 2006-05-12 | 42 032 | Paul Whelan |
| 255 | Bennett (Construction) Ltd. | Lusk Project - Apartment Second Floor - Internal Works | Dublin | Ireland | 2006-03-24 | 2006-05-11 | 8 196 | Gerald Ward |
| 256 | Michael McNamara & Co. Dublin | External Render Works in Longford | Longford | Ireland | 2006-03-30 | 2006-05-11 | 10 000 | James Godley |
| 257 | Campbell Construction Group | GHA Househillwood External Fabric Phase 1 | Glasgow | Scotland | 2005-11-21 | 2006-05-10 | 105 423 | David Wylie |
| 258 | Michael Fitzgerald & Sons LTD | Residential Development Leixlip - Block A,B and C- Taping and Jointing | Dublin | Ireland | 2005-11-01 | 2006-05-04 | 177 617 | John Hynes |
| 259 | Da Vinci`s Italian Restaurant Ltd | Refurbishment work in the restaurant | Dublin | Ireland | 2006-02-01 | 2006-04-29 | 11 573 | Pietro Macari |
| 260 | Campbell Construction Group | Extra Jobs - Labour Only | Glasgow | Scotland | 2005-07-06 | 2006-04-26 | 5 514 | David Wylie |
| 261 | Michael McNamara & Co. Dublin | Tullamore Hospital External Render | Dublin | Ireland | 2004-03-11 | 2006-03-30 | 365 552 | James Godley |
| 262 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks Block B - Internal Partitions & Ceilings | Dublin | Ireland | 2005-08-12 | 2006-03-27 | 203 519 | Claire Crone |
| 263 | Fleming Construction Cork | Fota Development - Paddock - Skimming and boarding | Cork | Ireland | 2005-10-14 | 2006-03-18 | 65 123 | Pat Stack |
| 264 | Michael Fitzgerald & Sons LTD | Station Road, Leixlip - Block I and J - External Render | Dublin | Ireland | 2005-06-28 | 2006-03-11 | 229 234 | John Hynes |
| 265 | Laing O'Rourke | Belgard Square West - Tallaght | Dublin | Ireland | 2005-04-27 | 2006-03-10 | 403 009 | Paul Taylor |
| 266 | Campbell Construction Group | SLC East Mains External Fabric Repairs Dunglass Avenue Phase II | Glasgow | Scotland | 2006-02-01 | 2006-03-07 | 17 739 | David Wylie |
| 267 | Campbell Construction Group | SLC Murray Ext Fabric Rapairs Mungo Park I | Glasgow | Scotland | 2006-01-23 | 2006-02-21 | 16 853 | David Wylie |
| 268 | Campbell Construction Group | Petersburn, Airdrie - Extra Jobs - Labour Only | Glasgow | Scotland | 2005-07-29 | 2006-02-18 | 2 091 | David Wylie |
| 269 | Campbell Construction Group | SLC East Mains External Fabric Repairs Dunglass Avenue Phase I | Glasgow | Scotland | 2005-11-21 | 2006-02-18 | 39 724 | David Wylie |
| 270 | Campbell Construction Group | GHA Levernwood Year 3 Fabric | Glasgow | Scotland | 2005-10-26 | 2006-02-06 | 104 173 | David Wylie |
| 271 | P.J. Hegarty and Sons Cork | PJ Hegarty - Kinsale | Kinsale | Ireland | 2005-06-23 | 2006-02-04 | 18 130 | Don OReagan |
| 272 | Laing O'Rourke | Belgard Square West - Tallaght - Balconies and External Joints | Dublin | Ireland | 2005-08-24 | 2006-01-31 | 158 295 | Paul Taylor |
| 273 | Campbell Construction Group | SLC Murray Fabric Repairs Livingston Drive 2 | Glasgow | Scotland | 2005-12-01 | 2006-01-20 | 19 615 | David Wylie |
| 274 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks - External Render | Dublin | Ireland | 2004-01-01 | 2006-01-18 | 297 885 | Claire Crone |
| 275 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks Block C and D - Atrium Walls | Dublin | Ireland | 2005-09-09 | 2005-12-07 | 63 377 | Claire Crone |
| 276 | Michael Fitzgerald & Sons LTD | Residential Development Leixlip - Block I and J - Taping and Jointing | Dublin | Ireland | 2005-06-15 | 2005-12-07 | 131 979 | John Hynes |
| 277 | Campbell Construction Group | SLC - Extra Jobs - Labour Only | Glasgow | Scotland | 2005-09-13 | 2005-12-03 | 1 298 | David Wylie |
| 278 | Campbell Construction Group | SLC Maxwellton Road External Fabric Phase II | Glasgow | Scotland | 2005-11-08 | 2005-12-03 | 18 091 | David Wylie |
| 279 | Campbell Construction Group | SLC Maxwelton Road External Fabric Phase I | Glasgow | Scotland | 2005-09-27 | 2005-12-02 | 26 233 | David Wylie |
| 280 | Michael McNamara & Co. Dublin | LVH Leisure Centre - External Render - STO System | Dublin | Ireland | 2005-01-31 | 2005-11-29 | 164 023 | Kevin O'Connor |
| 281 | Campbell Construction Group | GHA Cumming Drive | Glasgow | Scotland | 2005-09-19 | 2005-11-25 | 38 077 | David Wylie |
| 282 | Fleming Construction Cork | Drylinining - Fota Development - Reskimming House No 13 & 15 | Cork | Ireland | 2005-11-12 | 2005-11-17 | 1 540 | Mark Hand |
| 283 | Fleming Construction Cork | Drylining - Fota Development | Cork | Ireland | 2005-04-21 | 2005-11-03 | 1 104 | Pat Stack |
| 284 | Campbell Construction Group | Marylee Fabric Houses GHA | Glasgow | Scotland | 2005-07-25 | 2005-11-02 | 96 751 | David Wylie |
| 285 | Ballymore Homes | Pelletstown - Block 3 Townhouse - Rendering and Patching - Walls and Balconies | Dublin | Ireland | 2005-08-01 | 2005-10-31 | 16 461 | Michael Bermingham |
| 286 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks Block B - External Render | Dublin | Ireland | 2005-07-27 | 2005-10-31 | 37 221 | Claire Crone |
| 287 | Ormond Building Products | Saint James | Ireland | 2005-10-29 | 2005-10-29 | 960 | ||
| 288 | Fusion Building Systems Ltd. | Castlebar | Dublin | Ireland | 2005-08-08 | 2005-10-29 | 92 700 | Ger Fahey |
| 289 | Concast | Grangeford OFF SITE - Royal Canal Park - Pelleststown - Rendering Panels | Dublin | Ireland | 2004-01-01 | 2005-10-29 | 443 319 | Paul Whelan |
| 290 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks - Petrarch | Dublin | Ireland | 2004-11-19 | 2005-10-29 | 523 773 | Claire Crone |
| 291 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks - Rainwater System | Dublin | Ireland | 2005-09-06 | 2005-10-28 | 2 102 | Claire Crone |
| 292 | Concast | Hazelhatch - Internal Render | Dublin | Ireland | 2005-09-20 | 2005-10-27 | 9 500 | Paul Whelan |
| 293 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks - Steni Colour & Bauclad | Dublin | Ireland | 2005-02-07 | 2005-10-27 | 150 260 | Claire Crone |
| 294 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks Block B - Petrarch & Bauclad | Dublin | Ireland | 2005-07-12 | 2005-10-26 | 178 296 | Claire Crone |
| 295 | Campbell Construction Group | SLC Murray Fabric Repairs Livingston Drive | Glasgow | Scotland | 2005-08-15 | 2005-10-21 | 20 410 | David Wylie |
| 296 | Raphael Higgins | Skimming - Raphael Higgins | Cork | Ireland | 2005-10-01 | 2005-10-15 | 3 920 | Raphael Higgins |
| 297 | Tudor Homes | Rendering Panels - Shankhill | Shankhill | Ireland | 2005-03-01 | 2005-09-26 | 115 814 | David Browne |
| 298 | Michael McNamara & Co. Dublin | Tullamore Hospital External Render - Plywood Background | Dublin | Ireland | 2005-05-23 | 2005-09-24 | 15 174 | James Godley |
| 299 | Michael McNamara & Co. Dublin | LVH Leisure Centre - Stud Partitions | Dublin | Ireland | 2004-11-06 | 2005-09-02 | 61 803 | Kevin O'Connor |
| 300 | Michael McNamara & Co. Dublin | Liffey Valley Hotel - Penthouse - Suspended Ceiling | Dublin | Ireland | 2005-04-30 | 2005-08-27 | 28 236 | Kevin O'Connor |
| 301 | Michael McNamara & Co. Dublin | Liffey Valley Hotel - Penthouse - Stud Partitions | Dublin | Ireland | 2005-04-04 | 2005-08-26 | 63 743 | Kevin O'Connor |
| 302 | Fusion Building Systems Ltd. | Adamstown Castle - Phase 1 | Dublin | Ireland | 2005-06-01 | 2005-08-08 | 51 353 | Ger Fahey |
| 303 | Tudor Homes | Cabinteely Rendering - Phase II | Cabinteely | Ireland | 2005-05-17 | 2005-08-08 | 84 150 | David Browne |
| 304 | Tudor Homes | Cabinteely Rendering | Cabinteely | Ireland | 2004-10-04 | 2005-08-06 | 83 874 | David Browne |
| 305 | Campbell Construction Group | GHA Arden Ave and Stewarton Rd | Glasgow | Scotland | 2005-06-13 | 2005-08-01 | 44 345 | David Wylie |
| 306 | Concast | Royal Canal Park Pelletstown - Mastic | Dublin | Ireland | 2005-01-20 | 2005-07-31 | 191 198 | Paul Whelan |
| 307 | Concast | Ossory Road - Additional Works | Dublin | Ireland | 2005-07-05 | 2005-07-15 | 3 894 | Paul Whelan |
| 308 | Macushla Property Developments Ltd. c/o Rogerson Reddan & Associates Ltd. | The Steelworks - Bauclad - Soffits and Fascias | Dublin | Ireland | 2004-10-26 | 2005-07-15 | 74 693 | Claire Crone |
| 309 | Concast | Installation of Precast Concrete Panels - Athy | Dublin | Ireland | 2005-04-18 | 2005-07-14 | 15 844 | Paul Whelan |
| 310 | Fleming Construction Cork | Drylining - Rushbrooke Phase 6 | Dublin | Ireland | 2005-04-28 | 2005-07-13 | 36 610 | Pat Stack |
| 311 | P.J. Hegarty and Sons Cork | Lapps Quay Hotel Building - Andersons Street Elevation | Cork | Ireland | 2004-08-27 | 2005-07-08 | 97 756 | Don OReagan |
| 312 | P.J. Hegarty and Sons Cork | Lapps Quay Office Building - Mastic Joints | Cork | Ireland | 2005-03-17 | 2005-07-07 | 1 550 | Don OReagan |
| 313 | P.J. Hegarty and Sons Cork | Lapps Quay Office Building | Cork | Ireland | 2005-02-14 | 2005-07-07 | 83 808 | Don OReagan |
| 314 | Campbell Construction Group | Mosspark Bouleward | Glasgow | Scotland | 2005-06-25 | 2005-07-06 | 3 588 | David Wylie |
| 315 | Concast | Installation of Precast Concrete Panels - Rathdowney | Dublin | Ireland | 2005-06-22 | 2005-07-06 | 6 355 | Paul Whelan |
| 316 | Campbell Construction Group | GHA Arden Ave | Glasgow | Scotland | 2005-04-25 | 2005-07-05 | 51 917 | David Wylie |
| 317 | Concast | Wexford - Car Park Paul Quay - Mastic | Wexford | Ireland | 2005-05-23 | 2005-06-30 | 12 750 | Paul Whelan |
| 318 | Concast | Grangeford Office & Factory - External Rendering | Dublin | Ireland | 2005-06-20 | 2005-06-20 | 1 116 | Paul Whelan |
| 319 | Fleming Construction Cork | Drylining Bandon 2 | Dublin | Ireland | 2005-05-09 | 2005-06-17 | 18 242 | Pat Stack |
| 320 | Pat Browne | Drylining - Pat Browne | Cork | Ireland | 2005-05-25 | 2005-05-30 | 804 | Pat Browne |
| 321 | Concrete Building Systems | Shankhill | Dublin | Ireland | 2004-11-20 | 2005-05-20 | 8 848 | Ian Scott |
| 322 | Michael McNamara & Co. Dublin | Liffey Valley Hotel - Penthouse - External Render | Dublin | Ireland | 2005-04-22 | 2005-05-19 | 16 682 | Kevin O'Connor |
| 323 | Fleming Construction Cork | Drylining - Rushbrooke houses | Dublin | Ireland | 2005-02-07 | 2005-05-19 | 53 900 | Pat Stack |
| 324 | Rory Corbet Co. | Walter Macken Flats | Galway | Ireland | 2004-05-31 | 2005-05-14 | 443 676 | Rory Corbett |
| 325 | Michael McNamara & Co. Dublin | Fairgreen Hotel II - sample of the render | Galway | Ireland | 2005-04-29 | 2005-05-12 | 4 760 | Paul Brennan |
| 326 | Fleming Construction Cork | Drylining - Rushbrooke house No 420 | Cork | Ireland | 2005-05-07 | 2005-05-07 | 72 | Pat Stack |
| 327 | Michael McNamara & Co. Dublin | Tullamore - Zone 8 | Dublin | Ireland | 2004-11-15 | 2005-05-04 | 8 627 | James Godley |
| 328 | P.J. Hegarty and Sons Cork | Lapps Quay - Mastic - Andersons Street Elevation | Cork | Ireland | 2004-10-12 | 2005-04-22 | 5 560 | Don OReagan |
| 329 | Concast | Rendering Panels - Belgard Walls inTallaght | Dublin | Ireland | 2005-02-10 | 2005-04-18 | 47 402 | Paul Whelan |
| 330 | P.J. Hegarty and Sons Cork | Lapps Quay - Ceiling | Cork | Ireland | 2005-02-02 | 2005-04-16 | 11 600 | Don OReagan |
| 331 | P.J. Hegarty and Sons Cork | Lapps Quay Hotel Building - O'Briens Street Elevation | Cork | Ireland | 2004-11-12 | 2005-04-06 | 125 137 | Don OReagan |
| 332 | Michael McNamara & Co. Dublin | Liffey Valley Hotel 2 | Dublin | Ireland | 2004-01-07 | 2005-04-06 | 469 304 | Kevin O'Connor |
| 333 | P.J. Hegarty and Sons Cork | Lapps Quay - Mastic - OBriens Street Elevation | Cork | Ireland | 2005-02-18 | 2005-04-04 | 2 894 | Don OReagan |
| 334 | Concrete Building Systems | Pearse Street | Dublin | Ireland | 2004-01-05 | 2005-03-23 | 312 576 | |
| 335 | Greenspan Products Ltd | Santry Cross - Dryvit | Dublin | Ireland | 2004-10-27 | 2005-03-18 | 79 159 | |
| 336 | Ballymore Homes | Pelletstown - Block 3 Townhouse - Meshtex - Phase 3 | Dublin | Ireland | 2005-03-03 | 2005-03-15 | 9 567 | Michael Bermingham |
| 337 | Fleming Construction Cork | Rushbrooke - Patching | Cobh | Ireland | 2005-02-14 | 2005-03-09 | 624 | Pat Stack |
| 338 | Michael McNamara & Co. Dublin | Tullamore Hospital - Barrium Plaster | Tullamore | Ireland | 2004-06-05 | 2005-03-01 | 2 349 | James Godley |
| 339 | Ballymore Homes | Pelletstown - Meshtex - Phase 2 - Block 5ES Curved Wall | Dublin | Ireland | 2004-12-08 | 2005-02-26 | 11 723 | Michael Bermingham |
| 340 | Concast | Limerick - Car Park Mary Street | Dublin | Ireland | 2004-11-29 | 2005-02-17 | 43 875 | Paul Whelan |
| 341 | Unigold Investments | Meakstown - Second Building | Dublin | Ireland | 2004-11-11 | 2005-02-16 | 10 000 | Andrew Lewis |
| 342 | Michael McNamara & Co. Dublin | York Street - External Insulation | Dublin | Ireland | 2005-02-01 | 2005-02-10 | 5 500 | Eddie Martin |
| 343 | Fleming Construction Cork | Drylining - Boarding and Skimming- Plots No: 414, 415, 416, 417, 418, 419, 420, 421 | Dublin | Ireland | 2004-09-20 | 2005-02-10 | 75 948 | Pat Stack |
| 344 | Fleming Construction Cork | Bandon Rosewood - Plot No 17 | Dublin | Ireland | 2005-01-17 | 2005-02-01 | 14 218 | Pat Stack |
| 345 | Fusion Building Systems Ltd. | Manchester off site | Cork | Ireland | 2005-01-21 | 2005-01-24 | 6 067 | Kieran White |
| 346 | Fusion Building Systems Ltd. | Cambridge - Senses Phase 2 | Cambridge | England | 2004-12-01 | 2004-12-15 | 6 918 | Ger Fahey |
| 347 | Kealy & McLoughlin | 43 Castle Grove | Dublin | Ireland | 2004-12-04 | 2004-12-13 | 2 613 | Tom McLoughlin |
| 348 | Michael McNamara & Co. Dublin | Ennis Information Age Park - Meshtex | Dublin | Ireland | 2004-11-25 | 2004-12-04 | 6 522 | David Heaney |
| 349 | Tolmac Construction Ltd. | JCMH New Extension | Dublin | Ireland | 2004-09-22 | 2004-12-01 | 22 145 | John Scott |
| 350 | Fusion Building Systems Ltd. | Angel school | London | England | 2004-05-21 | 2004-11-30 | 47 455 | Ger Fahey |
| 351 | Fusion Building Systems Ltd. | High Wycombe | High Wycombe | England | 2004-06-15 | 2004-11-09 | 49 143 | Ger Fahey |
| 352 | BAM Building Cork Ltd | Courthouse - Patching | Cork | Ireland | 2004-11-04 | 2004-11-06 | 1 612 | Tom Vaughan |
| 353 | Fusion Building Systems Ltd. | Cambridge - Senses Phase 1 | Cambridge | England | 2004-06-07 | 2004-11-05 | 85 070 | Ger Fahey |
| 354 | Michael McNamara & Co. Dublin | Fairgreen Hotel | Galway | Ireland | 2004-05-26 | 2004-11-02 | 83 000 | Paul Brennan |
| 355 | Fusion Building Systems Ltd. | Merton - Metal Frame | London | England | 2004-07-31 | 2004-10-29 | 33 219 | Ger Fahey |
| 356 | Fleming Construction Cork | Bandon - Skimming and boarding | Dublin | Ireland | 2004-05-27 | 2004-10-25 | 19 806 | Pat Stack |
| 357 | Unigold Investments | Meakstown - External Render | Dublin | Ireland | 2004-04-30 | 2004-10-20 | 71 577 | Andrew Lewis |
| 358 | M.J. Duncan And Sons Limited | Morehampton Lane | Dublin | Ireland | 2004-10-13 | 2004-10-19 | 3 116 | |
| 359 | Concrete Building Systems | Cabinteely-Precast Panels | Dublin | Ireland | 2004-05-11 | 2004-10-15 | 70 952 | Ian Scott |
| 360 | Unigold Investments | Meakstown - Front Elevation | Dublin | Ireland | 2004-09-08 | 2004-10-14 | 10 000 | Andrew Lewis |
| 361 | Makers | Rampton - ED4479 | Rampton | England | 2003-04-01 | 2004-10-11 | 200 439 | Mark Anderson |
| 362 | Michael McNamara & Co. Dublin | Tullamore Retail Park | Dublin | Ireland | 2004-08-13 | 2004-09-28 | 9 044 | James Godley |
| 363 | Michael McNamara & Co. Dublin | Trinity College | Dublin | Ireland | 2004-02-04 | 2004-09-24 | 37 186 | Ed McNamara |
| 364 | Dodley Filan | Winton RD | Dublin | Ireland | 2004-04-01 | 2004-09-21 | 21 066 | Dodley Filan |
| 365 | Michael McNamara & Co. Dublin | Elm Park | Dublin | Ireland | 2004-06-24 | 2004-09-21 | 29 000 | Ed McNamara |
| 366 | Fleming Construction Cork | Drylining - House No 14 | Dublin | Ireland | 2004-09-06 | 2004-09-20 | 14 034 | Pat Stack |
| 367 | P. J. Walls Dublin | Camden Row | Dublin | Ireland | 2004-01-09 | 2004-09-20 | 140 435 | John Delaney |
| 368 | BAM Building Cork Ltd | Courthouse Project | Cork | Ireland | 2004-09-02 | 2004-09-18 | 9 592 | Tom Vaughan |
| 369 | John Sisk & Son Ltd | County Council Offices - Main Building | Nenagh | Ireland | 2004-01-21 | 2004-09-14 | 93 087 | Pat Carr |
| 370 | Fleming Construction Cork | Drylining-Boarding and Skimming-Plots No: 181a, 182, 183a, 184, 185a, 186, 187a, 188, 189a, 190, 209 | Dublin | Ireland | 2004-01-28 | 2004-09-02 | 42 816 | Pat Stack |
| 371 | Michael McNamara & Co. Dublin | JCMH - Additional Work | Dublin | Ireland | 2004-01-21 | 2004-08-31 | 12 684 | Paul Brennan |
| 372 | John Sisk & Son Ltd | County Council Offices - Creche | Dublin | Ireland | 2004-08-31 | 2004-08-31 | 50 587 | Pat Carr |
| 373 | Concast | SAS Radisson | Athlone | Ireland | 2004-01-13 | 2004-08-31 | 60 000 | |
| 374 | Michael McNamara & Co. Dublin | Main Office External Render | Dublin | Ireland | 2004-08-13 | 2004-08-27 | 2 957 | Jim Kelly |
| 375 | Mythen Construction Ltd. | Talbot Hotel | Wexford | Ireland | 2003-01-01 | 2004-08-23 | 83 756 | |
| 376 | Fusion Building Systems Ltd. | Fusion Office Internal Work | Dublin | Ireland | 2004-02-16 | 2004-08-06 | 43 161 | Mark Hand |
| 377 | Unigold Investments | Meakstown - Gebrik | Dublin | Ireland | 2004-06-03 | 2004-07-30 | 15 224 | Andrew Lewis |
| 378 | Michael McNamara & Co. Dublin | Taping and Jointing | Dublin | Ireland | 2004-07-07 | 2004-07-15 | 5 017 | John O Halloran |
| 379 | Michael McNamara & Co. Dublin | Galway Clinic | Dublin | Ireland | 2004-06-01 | 2004-06-30 | 5 376 | Patrick McDonagh |
| 380 | Michael McNamara & Co. Dublin | External Render - Tralee | Dublin | Ireland | 2004-04-30 | 2004-06-09 | 64 029 | John O Halloran |
| 381 | Stone Systems | Barrow Street -Stone Frame | Trim | Ireland | 2004-02-19 | 2004-06-03 | 8 758 | Liam Hughes |
| 382 | Fusion Building Systems Ltd. | Kill - Erecting Metal Frame Panels | Kill | Ireland | 2004-05-05 | 2004-05-19 | 10 329 | Ger Fahey |
| 383 | Ballymore Homes | Pelletstown - Meshtex - Phase 1 - Block 3B | Dublin | Ireland | 2004-03-22 | 2004-04-28 | 18 323 | Michael Bermingham |
| 384 | Fleming Construction Cork | Job nr 495 - External Work | Cork | Ireland | 2003-01-01 | 2004-04-27 | 8 437 | Mark Hand |
| 385 | Fusion Building Systems Ltd. | Job No 125 Fusion Office External Render | Dublin | Ireland | 2004-03-16 | 2004-04-21 | 14 790 | Mark Hand |
| 386 | Fleming Construction Cork | Job No 421 | Cork | Ireland | 2004-04-02 | 2004-04-03 | 330 | Mark Hand |
| 387 | Fleming Construction Cork | Job nr 495 - Internal Work | Cork | Ireland | 2004-01-05 | 2004-03-31 | 9 725 | Mark Hand |
| 388 | Michael McNamara & Co. Dublin | Dartry Road | Dublin | Ireland | 2003-01-01 | 2004-01-27 | 229 138 | Tim Sheehan |
| 389 | Fusion Building Systems Ltd. | Erecting Houses | Cork | Ireland | 2003-01-01 | 2004-01-24 | 16 686 | Ger Fahey |
| 390 | Makers | Gloucester Hospital - ED4473 | Gloucester | England | 2003-02-01 | 2003-12-31 | 114 718 | Mark Anderson |
| 391 | Concast | Grangeford OFF SITE - Limerick Car Park - Rendering Panels | Dublin | Ireland | 2003-02-01 | 2003-02-01 | 18 375 | Paul Whelan |
| 392 | Concast | Grangeford OFF SITE - Ballymun Gateway - Rendering Panels | Dublin | Ireland | 2003-01-01 | 2003-01-01 | 55 190 | Paul Whelan |
| 393 | Skanska Szwecja | Kosciuszki 32 Krakow | Kraków | Poland | 1999-08-31 | 2000-03-17 | 114 471 | |
| 394 | Sunley Polska | Tesco Kapelanka Krakow | Kraków | Poland | 1999-01-04 | 1999-08-15 | 157 398 | |
| 395 | Opex S.A. | Browar Namysłow | Namysłów | Poland | 1998-03-01 | 1998-12-13 | 119 241 | |
| 396 | P.P.H.U PERFEKT Janusz Albrycht | J. Albrycht drzwi - Janusz Albrycht | Częstochowa | Poland | 591 | Janusz Albrycht | ||
| 397 | P.J. Hegarty and Sons Cork | Lapps Quay Hotel Building - OBriens Street Elevation - Refund for Materials | Cork | Ireland | 2 082 | Don OReagan | ||
| 398 | Przedsiębiorstwo Naukowo - Produkcyjno - Handlowe "ALBUD" Sp. z o.o. | Salon samochodowy - Albud | Katowice | Poland | 2 146 | Edyta Mendak | ||
| 399 | P.J. Hegarty and Sons Cork | Lapps Quay - Kiosk | Cork | Ireland | 2 613 | Don OReagan | ||
| 400 | Dospel Sp. z o.o. | Air Conditioning Installation | London | England | 2 704 | |||
| 401 | Bowen Construction Ltd. | Bandon Grammar School - Terracotta cladding rev 1 | Dublin | Ireland | 2009-08-03 | 3 600 | Damian Clifford | |
| 402 | Metek System UK Ltd. | Wolverhampton | Wolverhampton | England | 6 018 | |||
| 403 | Ormond Building Products | Bishop Street | Dublin | Ireland | 6 528 | Fintan Molly | ||
| 404 | Griffner & Coillte | Rendering Timber Frame Houses | Dublin | Ireland | 10 924 | Peter Raftery | ||
| 405 | Abbey Building Contractors | Belmont - Aluminium Railings | Dublin | Ireland | 2009-07-27 | 11 466 | Albert Connaughton | |
| 406 | Aluglass Ireland Ltd. | Cookstown | Dublin | Ireland | 17 460 | |||
| 407 | Michael McNamara & Co. Dublin | Woodlands Road | Dublin | Ireland | 23 812 | Paul Brennan | ||
| 408 | Nihao Ltd | Rowlagh C.U. - GLAZING | Dublin | Ireland | 30 002 | Andrzej Kowalczyk | ||
| 409 | Abbey Building Contractors | Belmont Nursing Home - Glass balustrade | Dublin | Ireland | 47 801 | Albert Connaughton | ||
| 410 | m21systems ltd. | Merry Hill | Wolverhampton | England | 61 956 | Adrian Bishop | ||
| 411 | Nihao Ltd | Ringaskiddy Cork - Bedroom Windows Revision - sprzedaz | Cork | Ireland | 68 419 | Andrzej Kowalczyk | ||
| 412 | System Build Ireland. | WP-SBI Internal reconciliation | Ireland | 118 055 | ||||
| 413 | System Build Ireland. | SBI Internal reconciliation | Ireland | 202 811 | ||||
| 414 | Michael McNamara & Co. Dublin | Liffey Valley Hotel Phase 1 | Dublin | Ireland | 469 224 | Brendan Doyle | ||
| Total: | 60 005 465 | EURO | ||||||
| Total: | 60 100 270 | EURO | ||||||